Bowdens Silver Project Rapid Mapping of Ore Hardness in 3D Case Study
Project Overview
Highly variable ore hardness presented a challenge for process plant design, mine scheduling and operations. A programme of conventional comminution testing to map ore hardness in 3D would be expensive, slow, and would require a vast amount of new core drill holes. AMC’s field trial and multivariate analysis established predictive relationships that enabled the results of 14 SAG mill comminution (SMC) tests to be extrapolated, using 12,529 sample assays from previous core and reverse circulation drill holes. This leveraged off existing resource drill hole data, saving time and money.
The challenge
Forecasting the hardness of the ore and correctly scheduling the mining sequence will be important for comminution circuit design and for meeting throughput targets. The results of the conventional comminution tests indicated a wide range from soft to very hard ore, even within the same rock type.
The result
The tests demonstrated that the Equotip can be used to map hardness variations in drill core at a scale that can be correlated to comminution test data and geological observations. At a cost of a few dollars per metre, the Equotip survey was much less expensive than conventional comminution testing. Systematic logging of all the drill core from the deposit with an Equotip is, therefore, a cost-effective option. The ability to map hardness in 3D provides a basis for much better estimates of power consumption, mill throughput, and operating costs for the Bowdens project.